Monday, 25 June 2018

Download E22-285 Braindumps – EMC E22-285 Real Exam Questions

Question NO : 9

What is the VxRail maximum cluster size if using only 1 GbE links?

A. 8
B. 16
C. 32
D. 64 with an RPQ

Answer: A

Explanation:

Referencehttps://www.emc.com/collateral/specification-sheet/vxrail-4.0-spec-sheet.pdf

Tuesday, 19 June 2018

Daily Update EMC E22-285 Questions Dumps4download.com

Question NO : 8

In a VxRail external vCenter deployment, which component(s) are automatically licensed?

A. vCenter only
B. vCenter and vSAN
C. None
D. vSAN only

Answer: B

Explanation:

Referencehttps://www.emc.com/collateral/guide/h15844-vxrail-4-0-vcenter-serverpg.pdf(page 5)

Friday, 20 April 2018

Get EMC E22-285 Exam Free Study material | Dumps4download

Question No : 7

What is a consideration for using link aggregation on the Top of Rack (ToR) switch for a VxRail?

A. Should not be used for VxRail node ports, but can be used for uplink and ISL
B. Is not supported on the VxRail ToR switch
C. Can be configured for any connectivity, but are not required
D. Should always be configured for VxRail node ports to allow for failover

Answer: A

Wednesday, 18 April 2018

Actual EMC Free E22-285 Practice Questions

Question No : 6

A company has chosen to deploy an external vCenter/PSC. They would like to use the bundled vCenter license that comes with VxRail. What is the correct procedure to do this?

A. Contact EMC Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.
B. Contact VMware Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.
C. Log into VxRail Manager through SSH and extract the vCenter license key from the application properties file.Next, license the newly created vCenter.Last, deploy VxRail with external vCenter.
D. Bundled vCenter license is only valid when vCenter is internally deployed. The company must provide their own vCenter license.

Answer: D

Monday, 8 January 2018

Get Latest E22-285 Exam Dumps Questions - E22-285 Exam Dumps - Dumps4Download

Question No 5

Which VxRail Manager tab is used to set up the EMC Online Support Account and ESRS?

A. HEALTH
B. SUPPORT
C. DASHBOARD
D. CONFIG

Answer: B

Explanation:

Referencehttps://learningcontent.emc.com/gatekeepercontent/cninv000000000136183/stor
y_content/external_files/VxRail%20Lab%20Guide-Admin%20and%20Management4.0-
v2_ID.pdf

Download Verified E22-285 Exam Certifications Questions - Dumps4Download

Question No 4

What is a requirement for the Top of Rack (ToR) switches used in a VxRail
implementation?

A. MLD Querier
B. EtherChannel
C. IPV4 and IPV6 Multicast
D. LACP

Answer: C

Download E22-285 Exam - Valid E22-285 Question Answers - Dumps4Download

Question No 3

What is the VxRail maximum cluster size if using only 1 GbE links?

A. 8
B. 16
C. 32
D. 64 with an RPQ

Answer: A

Explanation:


Referencehttps://www.emc.com/collateral/specification-sheet/vxrail-4.0-spec-sheet.pdf